India Change Management: Sixth Schedule and Deemed Approval
Updated: 2026-11-11 · GRZAN Regulatory Team · Verification date 2026-10-20
1. Key takeaways
India divides changes into major changes and minor changes, determined under the Sixth Schedule of the Medical Devices Rules, 2017. A major change requires prior approval from the Central Licensing Authority, which must state its position within 60 days; if no reply is received within that period, the change is deemed approved (Rule 38(1)(v)(vi)). A minor change requires only written intimation within 30 days of its occurrence (Rule 38(1)(vii)).
- Classification first: whether a change is major or minor is decided against the Sixth Schedule, not by internal judgement.
- Prior approval for major changes: the application goes in before the change is implemented, and the CLA has 60 days to decide.
- Deemed approval applies: silence beyond 60 days operates in the applicant’s favour under Rule 38(1)(vi).
- Minor changes run on notice, not approval: written intimation within 30 days after the change is enough.
2. Legal basis
The obligations for both categories, and the parallel rules on the manufacturing side, are set out below. The deadlines and the deemed-approval mechanism are statutory, not administrative practice.
| Item | Source | Content |
|---|---|---|
| Prior approval for major changes | MDR 2017 Rule 38(1)(v) | Before making a major change specified in the Sixth Schedule, the authorised agent must obtain the prior approval of the CLA, which must grant or reject it within 60 days |
| Deemed approval | MDR 2017 Rule 38(1)(vi) | Where no approval or rejection is communicated within the prescribed period, the change is deemed to have been approved |
| Minor change notification | MDR 2017 Rule 38(1)(vii) | The CLA must be informed within 30 days after a minor change is made |
| Changes in constitution | MDR 2017 Rule 38(1)(viii) | Where the constitution of the overseas manufacturer or authorised agent changes, the CLA must be informed in writing within 30 days |
| Corresponding manufacturing-side rule | MDR 2017 Rule 26(iii)(iv) | Major change: prior approval within 45 days (deemed approved thereafter); minor change: intimation within 30 days |
3. Expert insights
Insight 1: India has written deemed approval into the text. This is one of the core design features for which the MDR 2017 has been described as offering high certainty: if the regulator does not reply in time, the applicant prevails. Few markets provide this, and it changes the negotiation position of a company facing a slow review — the clock, not the file, decides the outcome after 60 days. The practical corollary is that a well-documented submission filed on day one is worth more than a perfect submission filed late.
Insight 2: the deadlines differ between import and manufacturing. On the import side a major change is subject to 60-day deemed approval; on the manufacturing side the period is 45 days. The same substantive change therefore carries a different waiting period depending on the path under which the product is held, which matters when a group holds both an import licence and a manufacturing licence for related products. Planning a single change across both licences means planning to the longer of the two periods.
Insight 3: a change in constitution is a separate obligation. A change in the corporate constitution of the overseas manufacturer or the agent — shareholders, organisational form — must be notified to the CLA in writing within 30 days. This provision is often treated as a corporate-affairs matter and omitted from regulatory reporting, even though it sits in the same rule as the product-related change duties. The 30-day clock starts from the change itself, so the notification cannot wait for the annual compliance review.
Insight 4: the Sixth Schedule is the criterion, not common sense. The major/minor divide is determined by the Sixth Schedule. For example, under the analysis of the rules, a change in the manufacturer’s name or address is a major change, while a design change that does not affect specifications, intended use, performance or stability is a minor change. Classifying by intuition rather than by the schedule is how companies end up notifying a major change as a minor one — which is a substantive violation, not a paperwork error. The reverse error also occurs: treating a minor change as major and waiting 60 days for a decision that was never needed.
4. Practical recommendations
- Build an India change-classification card. GRZAN prepares a change-classification card for clients that maps the changes a company commonly makes — packaging change, change of material supplier, addition of a model, relocation of premises, change of company name, software version upgrade — line by line against the Sixth Schedule, marking each as major or minor, the applicable deadline, and whether prior approval is required.
- Use the card before the change, not after. The purpose of the card is to move change management from after-the-fact judgement to a look-up that happens before implementation.
- Never downgrade a major change to a minor one to save time. Mis-notifying a major change as minor is a substantive violation, and the 60-day deemed approval only helps those who filed in the correct category.
- Record the filing date of every major change. Because deemed approval runs from the prescribed period, the submission date is the evidential anchor if the CLA’s reply never arrives.
- Keep corporate changes on the regulatory calendar. Shareholder or organisational changes at the manufacturer or agent level should be routed to the regulatory team, not only to company secretarial staff.
5. Verification checklist
- □ Each change has been classified against the Sixth Schedule (major/minor)
- □ Major changes have been submitted to the CLA before implementation, with the submission date recorded
- □ The deemed-approval date has been calculated on the 60-day (import) / 45-day (manufacturing) basis
- □ Minor changes have been notified within 30 days of occurrence
- □ Changes in corporate constitution have been notified in writing within 30 days
Regulatory information verified as of 27 October 2026.
How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support across South Asia, including India. Our team prepares dossiers to CDSCO expectations, manages SUGAM submissions and deficiency responses, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com
Disclaimer
Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.
About GRZAN
GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.
GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.
Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.
What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.
Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.
Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.
Take your devices global with GRZAN
We work with manufacturers worldwide to open new markets with a clear regulatory pathway.
Contact us