Argentina IVD Submission: Group Pathways and the Group D Testing Protocol

Updated: 2026-11-12 · GRZAN Regulatory Team · Verification date 2026-10-20

1. Key takeaways

Argentine IVDs are governed separately by Disposición ANMAT 2198/2022, and the submission pathway is divided by group: Groups A/B go through the declaration of conformity, while Groups C/D go through full technical review.

The review timelines are tiered accordingly: 15 administrative working days for IVD Groups A/B; 60–90 working days for Groups C/D; and 110 administrative working days for Group D, which must additionally attach a testing protocol covering at least 100 samples. This extra requirement for Group D is the only quantitative threshold in the IVD submission framework, and it shapes project planning more than any other single rule in the regime, because the protocol depends on external clinical cooperation that cannot be accelerated at will.

The group determination is therefore the first and most consequential decision in an Argentine IVD project. It fixes the pathway, the review speed and, for Group D, the only hard quantitative requirement in the entire regime. Determining the group early, and documenting the reasoning behind it, keeps every downstream workstream, from testing to labeling to timeline commitments, anchored to the same classification.

2. Legal basis

Regulatory instrumentNumberPublication dateRelevant provisions
IVD registration procedure (Groups A/B/C/D)Disposición ANMAT 2198/20222022Grouping provisions; registration procedure provisions; Group D testing protocol provisions
IVD labeling requirementsDisposición ANMAT 2674/991999Labeling provisions
Notification scheme for low and medium-risk productsDisposición ANMAT 236/2026Published February 6, 2026, effective 30 days after publicationProvisions applicable to A/B-group IVDs not requiring cold chain
Framework for recognition of international regulatory equivalenceDecreto 892/20252025Annex I (list of reference countries)

Together these instruments define both the route and the speed of an IVD submission: Disposición ANMAT 2198/2022 assigns products to groups and fixes the procedure and timelines, Disposición ANMAT 2674/99 governs labeling, and the combination of Decreto 892/2025 and Disposición ANMAT 236/2026 opens the notification route for a defined subset of A/B-group products.

For an IVD portfolio, the table suggests a two-track planning model: the C/D track, where the dominant variables are the testing protocol and the long review windows, and the A/B track, where the dominant variable is whether the product can qualify for the notification route. Running the two tracks with different templates, different timelines and different evidence strategies prevents the slower track’s assumptions from inflating the faster one’s plans, and vice versa.

3. Expert insights

Insight 1: the Group D testing protocol covering at least 100 samples is an action that must be completed before submission. It is not a deficiency item for the review phase; it is mandatory material at the time of filing. Group D covers testing for blood-borne pathogens and pathogens with high fatality risk, so sample acquisition and protocol design require the cooperation of clinical institutions, the preparation period is long, and the workstream should be started first, ahead of every other document.

Insight 2: the official window of 110 working days for Group D is not the project duration. As in the device regime, the official timeline excludes document preparation, the legalization chain and deficiency responses. The realistic project duration for a Group D submission should therefore be estimated by adding the preparation period and a deficiency buffer on top of the 110 working days, and communicating that practical estimate to stakeholders early so expectations are set correctly.

Insight 3: after 2026, Groups A/B have seen a divergence of pathways. Disposición 236/2026 brought A/B-group IVDs not requiring cold chain into the notification pathway, with exemption from local testing against a reference-country CFS. Cold-chain need became the new dividing line: A/B-group IVDs requiring cold chain remain on the conventional declaration-of-conformity pathway, so the same product group now splits into two different regulatory routes depending on a purely logistical property.

This pathway split also changes how the 24-month CFS cap interacts with IVD planning. An A/B-group product that qualifies for the notification route must hold a CFS compliant with the 236/2026 rule, while the same product, if it does require cold chain, is judged against the conventional default instead. The CFS procurement decision and the cold-chain assessment are therefore not independent workstreams; the first depends on the outcome of the second, and the sequence should be reflected in the project plan.

4. Practical recommendations

  1. Start the testing protocol first for Group D projects. The protocol covering at least 100 samples must be prepared in parallel with the registration documents, and clinical institutions and sample sources should be contacted early, since their availability sets the pace of the whole project.
  2. Split the performance verification data into analytical and clinical volumes. Compile analytical performance (precision, accuracy, detection limit, linearity, interference) and clinical performance (sensitivity, specificity, agreement rate) as separate volumes, so the reviewer can cross-reference them without untangling a mixed file.
  3. Assess cold-chain status and pathway feasibility for Groups A/B. First determine whether the product truly requires no cold chain, then determine whether a reference-country CFS can be obtained; both conditions must hold before the 236/2026 pathway can be used.
  4. Layer 2674/99 onto the labeling work. IVD labels must satisfy Disposición 2198/2022 and Disposición 2674/99 simultaneously, and the artwork review should check both instruments explicitly.

5. Verification checklist

  • □ A/B/C/D group determination completed
  • □ Group D testing protocol covering at least 100 samples completed
  • □ Performance verification data organized into analytical and clinical volumes
  • □ Applicable official review timeline confirmed by group (15 / 60–90 / 110 working days)
  • □ Cold-chain status and feasibility of the 236/2026 pathway assessed for Groups A/B
  • □ Label verified against both Disposición 2198/2022 and Disposición 2674/99

Regulatory information verified as of October 29, 2026.

In Argentina, GRZAN operates a wholly owned subsidiary that can serve as the registration holder and importer of record for foreign manufacturers, directly handling classification assessment, pathway selection, building the GMP and CFS documentation chain, Spanish-language localization of technical documentation and labeling, HELENA submissions and responses to deficiency letters, as well as BONITA import notifications, operation of the ARGOS vigilance system, change maintenance and planning for the 5-year renewal. For support with registration dossiers and conformity documentation for the Argentine market, contact the GRZAN regulatory team at info@grzanglobal.com.

The GRZAN regulatory team consists of professionals with many years of hands-on experience in international registrations, tracks the activity of regulatory authorities across markets on an ongoing basis, and applies a writing standard of conclusions first, traceable sources and verifiable figures to everything it publishes. For a market access plan tailored to a specific product in Argentina or the wider MERCOSUR region, the GRZAN regulatory team welcomes your enquiry at info@grzanglobal.com.

Disclaimer

Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.

About GRZAN

GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.

GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.

Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.

What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.

Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.

Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.

Take your devices global with GRZAN

We work with manufacturers worldwide to open new markets with a clear regulatory pathway.

Contact us
WhatsApp
QR Code
WhatsApp QR Code
Scan to chat on WhatsApp
Phone
Call
Office Mon-Fri 9:00-18:00
0755-88659477
Mobile 24/7 Service
+86 15816864648
Email
Mail