MDEL Annual Licence Review and Change Notices Before April 1

Updated: 2026-11-11 · GRZAN Regulatory Team · Verification date 2026-10-20

1. Key takeaways

MDEL holders carry two continuing obligations. The first is the Annual Licence Review (ALR): under paragraph 46.1(1), a review application must be submitted to the Minister before April 1 of each year, together with updates to the information and documents described in section 45. The second is change notification: if the information in paragraphs 45(a) and (b) changes, Health Canada must be notified within 15 calendar days.

  • The ALR deadline is a fixed statutory date of April 1 every year for holders whose licence is not suspended.
  • The ALR must include updates to the section 45 information and documents, not a bare confirmation that nothing has changed.
  • The 15-calendar-day notification duty applies only to changes in the information listed in paragraphs 45(a) and (b).
  • Supplier information must be refreshed at each ALR under the new paragraphs 45(f.1) and (f.2), effective December 14, 2026.
  • The right-to-sell annual fee for MDL holders is a separate annual obligation and must be planned independently of the ALR.

2. Legal basis

The two obligations rest on the amended Regulations and on Health Canada guidance. The table below lists the instruments relied on, the provisions concerned, the relevant dates and where each can be verified.

Regulation or documentProvisionsDatesSource
Medical Devices RegulationsParagraph 46.1(1): holders whose licence is not suspended must submit a review application before April 1 each year, including updates to the section 45 information and documentsAmended by SOR/2026-110, effective 2026-12-14Canada Gazette, Part II
GUI-0016, version 11Two actions to maintain an MDEL: (1) submit the ALR before April 1 each year; (2) notify changes to paragraph 45(a)(b) information within 15 calendar days2026-06-17 (effective 2026-12-14)canada.ca
Health Canada, About medical devicesTwo licence types and their annual maintenanceVerified in 2026canada.ca

Read together, these sources establish a simple split of duties: anything that falls under paragraphs 45(a) and (b) moves on a 15-day clock, while everything else in section 45 is updated through the annual review cycle that closes before April 1.

3. Expert insights

Insight 1: April 1 is a statutory date, not a fiscal-year starting point.

Under paragraph 46.1(1), the annual licence review application must be submitted before April 1 of each year. This coincides with the date on which Health Canada switches its official fees to the new annual rates (April 1). Companies can therefore consolidate the two categories of April 1 items in a single annual compliance calendar: the ALR submission on the regulatory side and the new fee schedule on the financial side. Treating these as one combined April workload reduces the risk that either item is overlooked during a busy reporting season.

Insight 2: the ALR requires updates, not a confirmation of no change.

As amended by SOR/2026-110, paragraph 46.1(1) expressly requires that the review application include the information and documents described in section 45, including any updates to that information or those documents. This means the ALR is not a tick-box exercise in which the holder simply confirms that nothing has changed. The holder is expected to actually go through each item, verify it against current facts, and submit genuine updates where anything has moved. A review submission prepared without a genuine reconciliation exercise would not meet the intent of the amended provision, and discrepancies discovered later during an inspection would be harder to explain than updates filed through the review itself.

Insight 3: the 15-calendar-day change notification applies only to paragraph 45(a) and (b) information.

The wording of GUI-0016 is that where the information in paragraphs 45(a) and (b) changes, Health Canada must be notified within 15 calendar days. Updates to other information are handled through the ALR instead. This division of labour must be written clearly into internal procedures; otherwise notifications that belong on the fast track can end up waiting for the annual cycle, which is precisely the kind of omission the short deadline is designed to prevent. In practice, the fastest way to make the split fail is to leave the classification decision to whoever happens to be processing the change on a given day, so the rule that decides which track applies should be fixed in the procedure document itself rather than left to interpretation at the moment a change occurs.

Insight 4: the ALR and the right-to-sell annual fee are two independent annual tracks.

The ALR for the MDEL follows paragraph 46.1(1). The right-to-sell annual fee for MDL holders follows section 77 of the Order Setting Out the Fees Payable for Drugs and Medical Devices (CAD 460, as of April 1, 2026). The two items have different responsible parties, different legal bases and different mechanics, so they must be arranged separately even though both run on an annual rhythm anchored around April 1.

4. Practical recommendations

  • Build an annual compliance calendar: complete the MDEL ALR before April 1, and in the same window confirm the MDL right-to-sell annual fee.
  • Reconcile the ALR item by item against section 45 and update it, rather than ticking a box marked no change.
  • Split the change-management process into two tracks: paragraph 45(a)(b) information triggers a notification within 15 calendar days; other information goes into the ALR update.
  • Refresh supplier information at each ALR under the new paragraphs 45(f.1)(f.2), effective December 14, 2026.
  • Keep proof of submission for every ALR and every change notification.

5. Verification checklist

  • □ Calendar reminders are set for completing the ALR before April 1
  • □ The ALR has been reconciled and updated item by item against section 45, including supplier information
  • □ A process is in place for notifying paragraph 45(a)(b) changes within 15 calendar days
  • □ The MDL right-to-sell annual fee (CAD 460) is planned separately from the ALR
  • □ Proof of submission for ALRs and change notifications is archived
  • □ Internal procedures clearly separate change notifications from ALR updates

Regulatory information verified as of October 28, 2026.

How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support for the Canadian market. Our team manages Health Canada Medical Device Licence and MDEL applications, prepares risk-classified dossiers, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com

Disclaimer

Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.

About GRZAN

GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.

GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.

Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.

What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.

Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.

Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.

Take your devices global with GRZAN

We work with manufacturers worldwide to open new markets with a clear regulatory pathway.

Contact us
WhatsApp
QR Code
WhatsApp QR Code
Scan to chat on WhatsApp
Phone
Call
Office Mon-Fri 9:00-18:00
0755-88659477
Mobile 24/7 Service
+86 15816864648
Email
Mail