Clinical Evaluation and the CER: Annex XIV
Updated: 2026-11-11 · GRZAN Regulatory Team · Verification date 2026-10-20
1. Key takeaways
Clinical evaluation is often reduced to a report, and that reduction is the root of many filing defects. Under the Turkish Regulation it is a planned, executed and documented activity spanning the whole life of the device. The points below identify the statutory basis, the manufacturer’s discretion over evidence levels, and the special gate that applies to high-risk products before any clinical work begins. The article gathers the provisions that define the activity, the discretion the manufacturer holds over evidence levels, and the additional gate for high-risk classes — three elements that together determine both the cost and the calendar of a filing.
- Clinical evaluation is a complete activity of planning, execution and documentation, not a single report. Paragraph 1 of Madde 61 requires the manufacturer to plan, conduct and document a clinical evaluation in accordance with that article and Part A of Ek XIV.
- The level of clinical evidence is set by the manufacturer, who must justify it. Paragraph 1 of Madde 61 states expressly that the manufacturer determines and justifies the level of clinical evidence needed to demonstrate conformity with the general safety and performance requirements; that level must be commensurate with the characteristics of the device and its intended purpose.
- Class III devices and those Class IIb devices referred to in point (b) of paragraph 1 of Madde 54 face an additional preliminary step before the clinical evaluation and/or clinical investigation (paragraph 2 of Madde 61). This is an extra constraint on high-risk products.
- The data basis of the clinical evaluation includes an assessment of the acceptability of the undesirable side effects referred to in points 1 and 8 of Ek I and of the benefit-risk ratio.
2. Legal basis
Two regulations define the evidential framework: the Medical Device Regulation, which governs clinical evaluation for devices, and the IVD Regulation, which substitutes performance evaluation for in vitro diagnostics. The table below records both instruments with their official references and the provisions relied upon in this article.
| Name of regulation | Original Turkish title | Reference / number | Publication date | Provision |
| Medical Device Regulation | Tıbbi Cihaz Yönetmeliği | Resmî Gazete Sayı 31499 (1. Mükerrer) | 2021-06-02 | Madde 61 paragraphs 1 and 2; Part A of Ek XIV; points 1 and 8 of Ek I |
| Regulation on In Vitro Diagnostic Medical Devices | İn Vitro Tanı Amaçlı Tıbbi Cihaz Yönetmeliği | Resmî Gazete Sayı 31499 (1. Mükerrer) | 2021-06-02 | Madde 58 (corresponding provision on performance evaluation) |
3. Expert insights
Insight one: a commensurate level of clinical evidence can be self-determined, but it must leave a trace. The Regulation hands the determination of the evidence level to the manufacturer, and the price of that discretion is the duty to argue it. This constitutes a point that the notified body and the Kurum can challenge: if the CER contains only a statement that literature was searched, without explaining why that literature is sufficient to support the intended purpose, the chain of argument is broken. The justification must connect device characteristics, intended purpose and the type of evidence chosen, so that the reviewer can follow every link from claim to source. A well-built justification reads the evidence level downwards and upwards with equal care: it explains why less is sufficient where the device is simple, and why more is proportionate where the risk profile is higher.
Insight two: the high-risk preliminary step of paragraph 2 of Madde 61 is frequently underestimated. For Class III and certain Class IIb products, a procedure driven by point (b) of paragraph 1 of Madde 54 stands before the clinical evaluation. Treating it as optional forces the project to be rescheduled at a late stage. The consultation route affects timing, resourcing and the entire documentation calendar, so discovering it late does not merely delay one task — it reorders the plan that every other task depends on. Because the preliminary step involves external interaction, its duration is the least controllable variable in the plan, which is precisely why it belongs at the front of the schedule rather than the middle.
Insight three: IVDs follow performance evaluation, not clinical evaluation. The corresponding provision of the IVD Regulation is Madde 58, and the operative term is performance evaluation. Applying a CER template to an IVD project is visible to the reviewer at first glance as a mismatched system. The terminology, the structure and the evidence conventions differ, and a file that borrows the wrong vocabulary invites questions about whether the underlying analysis was ever properly framed. Alignment here is cheap at the template stage and expensive afterwards, so confirm the terminology before writing begins rather than at review.
4. Practical recommendations
- Open the CER with a dedicated chapter on the justification of the level of clinical evidence, stating the correspondence between device characteristics, intended purpose and the type of evidence selected.
- For Class III and the relevant Class IIb projects, schedule the preliminary procedure of paragraph 2 of Madde 61 into the Gantt chart before technical documentation work begins.
- Use the performance evaluation terminology (performans değerlendirmesi) consistently across IVD projects.
5. Verification checklist
- □ The planning, execution and archiving of the clinical evaluation have been completed under Madde 61 paragraph 1 and Part A of Ek XIV.
- □ The selected level of clinical evidence has been justified in writing as commensurate with the device characteristics and intended purpose.
- □ Class III devices and the Class IIb devices referred to in point (b) of paragraph 1 of Madde 54 have completed an assessment of the preliminary procedure.
- □ The benefit-risk conclusions have been made against points 1 and 8 of Ek I.
- □ IVD projects have switched to performance evaluation terminology and do not reuse the CER template.
Regulatory information verified to 29 October 2026. The provisions listed in this article were checked against the current text on the Turkish legislative information system (MevzuatNo 38657 and 38658).
How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support for the Turkish market. Our team prepares CE/UTS-compliant documentation, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com
Disclaimer
Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.
About GRZAN
GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.
GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.
Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.
What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.
Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.
Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.
Take your devices global with GRZAN
We work with manufacturers worldwide to open new markets with a clear regulatory pathway.
Contact us