Medical Equipment Regulations 5773-2013: Overview of 25 Articles
Updated: 2026-11-11 · GRZAN Regulatory Team · Verification date 2026-10-20
1. Key takeaways
The Medical Equipment Regulations (Registration of Medical Equipment in the Register and Renewal thereof), 5773-2013, were published on 12 June 2013, entered into force 30 days after publication under Section 25, comprise 25 articles, and were last amended on 10 May 2022. What actually forms the threshold for a submission are six articles: Section 3 (application elements), Section 5 (120-day decision period), Section 12 (validity period), Section 19 (manufacturing conditions, ISO 13485), Section 20 (storage and transport conditions, ISO 9001) and Section 23 (labelling in three languages). The remaining articles are mostly procedural or record-keeping duties, but Section 11 – outright rejection of an incomplete application – is the provision most likely to cause substantive delay, because its consequences include a 1-month bar on resubmitting the same application.
- Regulations 5773-2013: published 12 June 2013, in force 30 days later, 25 articles, last amended 10 May 2022.
- Section 5 sets a 120-day decision period for the Director.
- Section 19 requires ISO 13485 for manufacturing; Section 20 requires ISO 9001 for storage and transport.
- Section 23 requires labels in three languages.
- Section 11 allows rejection of an incomplete application without reasons, with a 1-month refiling bar.
2. Legal basis
The regulations are made under specific enabling provisions of the parent law, and their own numbering is the reference for every deadline discussed in this article. A citation difference exists in part of the secondary literature, which is noted in the table below.
| Name of legislation | Medical Equipment Regulations (Registration of Medical Equipment in the Register and Renewal thereof), 5773-2013 |
| Number | 5773-2013 (some sources cite 5774-2014; this is a citation difference – the number in the official legal database prevails) |
| Publication date | 12 June 2013; Section 25 provides for entry into force 30 days after publication; last amended 10 May 2022 |
| Articles | Sections 1–25 (detailed in the table below) |
| Enabling provisions | Medical Equipment Law, 5772-2012, Sections 3(c)(d), 6(c), 8(e) and 22 |
3. Expert insights
Regrouping the 25 articles by whom they bind is more useful than memorising them by number:
| Group | Sections | Duty holder |
| Submission threshold | Sections 3, 4, 11 | Applicant (IRH) |
| Decision and certificate | Sections 5, 16 | Director (120 days to decide, certificate in 3 working days, certified copy within 7 working days) |
| Period and renewal | Sections 12, 7, 8 | Registration holder (5-year cap, implants 3 years, low-risk non-sterile devices notify 30 days in advance, extension by 5 years after 14 working days without objection) |
| Quality and premises | Sections 19, 20 | Manufacturer (ISO 13485), storage and transport provider (ISO 9001) |
| Labelling and traceability | Sections 23, 24 | Registration holder (three-language labels, distribution records kept 3 years) |
| Life cycle | Sections 6, 13, 14, 15 | Registration holder (changes, withdrawal, notice of non-renewal, notification of changes) |
| Special categories | Sections 9, 10, 22 | Applicant (combination products, FDA priority, qualified professionals) |
| Import and export | Sections 17, 18 | Director (import approval, free-sale certificates) |
Section 11 deserves a separate warning: where an application is incomplete, the Director shall reject it without stating reasons, the fee is not refunded, the same application may not be resubmitted for 1 month from the notice of rejection, and after two rejections for incompleteness a further submission requires the Director’s written approval; however, resubmission within 6 months of the rejection notice attracts no additional fee. This is the hardest procedural provision in Israeli filing – the price of format and completeness problems here far exceeds the price of technical problems.
Seen as a whole, the distribution of duties across the eight groups explains much of what goes wrong in practice. The applicant-side articles concentrate the risk at the moment of filing, where the completeness standard of Section 3(a) meets the rejection mechanism of Section 11; the Director-side articles concentrate the timeline, so a company that plans around the 120-day decision period and the certificate issuance periods can build a reliable launch calendar; and the holder-side articles run for the whole life of the registration, from labelling and distribution records through change notifications to renewal. A submission project that assigns each group to a named owner – applicant, regulator-facing, and holder-side – converts the 25 articles from a legal text into an operating checklist.
4. Practical recommendations
- Build a responsibility matrix by group: map the 25 articles onto the manufacturer, the IRH and the importer so that no duty falls between chairs.
- Front-load the completeness self-check: before filing, tick off the 13 elements of Section 3(a) one by one and eliminate the Section 11 risk before submission.
- Keep a separate deadlines table: the periods in Sections 5, 8, 12 and 16 differ from one another; enter them all in one schedule with reminders.
- Track amendments to the regulations: the regulations were last amended in 2022, and AMAR’s subsequent reforms are implemented mainly through REG procedural documents, so both must be tracked together.
5. Verification checklist
- □ The completeness self-check against the 13 elements of Section 3(a) has been completed
- □ The manufacturer’s ISO 13485 certificate (Section 19) and the storage provider’s ISO 9001 certificate (Section 20) are valid
- □ Labelling complies with the three-language requirement of Section 23 or an exemption has been obtained
- □ Distribution records are kept for at least the 3 years required by Section 24
- □ The deadlines in Sections 5, 8, 12 and 16 have been entered in the schedule
- □ A contingency plan for an incompleteness rejection exists (alternatives during the 1-month cooling-off period)
Regulatory information verified as of 29 October 2026. All law names, numbers, publication dates and article numbers cited in this article were checked on that date against the official Israeli legal database and authoritative public sources; AMAR procedural documents are updated frequently, so before any formal submission please rely on the current version published on the Ministry of Health website.
How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support for the Israeli market. Our team manages Ministry of Health (MOH) registrations under the Medical Devices Law 5772-2012, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com
Disclaimer
Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.
About GRZAN
GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.
GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.
Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.
What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.
Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.
Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.
Take your devices global with GRZAN
We work with manufacturers worldwide to open new markets with a clear regulatory pathway.
Contact us