1. Key takeaways
Manufacturing medical devices in Macao, China requires a manufacturing licence under Article 32 of Law No. 12/2025. The licence is valid for 3 years and may be renewed for the same period (Article 33). The implementing rules contain one important business facilitation measure: applicants for a manufacturing licence may submit their application while still holding a provisional industrial licence, so as to shorten the time needed to obtain the licence. The application must be submitted on a dedicated form (stating the applicant, the name and address of the manufacturing plant, the number and date of issue of the industrial licence, the products to be manufactured, and the name of the technical director to be engaged) together with 12 categories of supporting documents, among which the quality management system documentation for the manufacturing activities is the core element.
- A manufacturing licence is mandatory for manufacturing medical devices in Macao, China.
- The licence is valid for 3 years and may be renewed for the same period.
- Applications may already be filed at the provisional industrial licence stage.
- A dedicated form and 12 categories of attachments must be prepared.
- Quality management system documentation is the core technical file.
- Renewal requires an on-site verification of compliance with good manufacturing practice.
2. Legal basis
The legal framework for the manufacturing licence consists of the parent law, the implementing rules, a technical dispatch on quality management system documentation, and the fee schedule approved by the Chief Executive. The table below summarises the instruments relied on in this article, together with the specific provisions cited.
| Regulatory instrument | Reference | Publication date | Provisions |
| Medical Devices Regulatory Regime | Law No. 12/2025 (Official Gazette No. 30/2025) | Published on 28 July 2025; effective on 1 July 2026 | Article 31 (categories of licences for medical device business activities); Article 32 (mandatory nature of the manufacturing licence); Article 33 (requirements for issue or renewal and validity of the manufacturing licence); Article 35 (business rules for medical device manufacturing plants); Article 65 (existing medical device manufacturing plants) |
| Implementing Rules of the Medical Devices Regulatory Regime | Administrative Regulation No. 11/2026 (Official Gazette No. 20/2026) | Published on 18 May 2026; effective on 1 July 2026 | Provisions on the application for a manufacturing licence (dedicated form and 12 categories of attachments); article on approval of plans and notification (30 working days for the opinion of the Environmental Protection Bureau and 30 working days for the decision of the ISAF); article on applying for inspection (inspection within 15 working days, one-year time limit); article on the inspection record (20 working days) |
| Technical Requirements for Preparing Quality Management System Documentation for Medical Device Manufacturing Activities | Dispatch No. 22/ISAF/2026 | Published in 2026; effective on 1 July 2026 | Full text of the dispatch |
| Dispatch of the Chief Executive No. 144/2026 approving the Fee Schedule for Medical Device Business Activities and Medical Device Registration | Dispatch of the Chief Executive No. 144/2026 (Official Gazette No. 24/2026) | Published on 15 June 2026; effective on 1 July 2026 | Table 1, item 1.1 (issue of a manufacturing licence, MOP 9,000); item 2.1 (renewal, MOP 3,000) |
| Executive Council completed the discussion of the draft administrative regulation on the Implementing Rules of the Medical Devices Regulatory Regime | Published on the portal of the Government of the Macao Special Administrative Region | 2026 | Statement of the facilitation measure allowing application at the provisional industrial licence stage |
3. Expert insights
Insight one: the manufacturing licence involves parallel review by several departments, not approval by the ISAF alone. The implementing rules provide that the ISAF forwards the application to the Environmental Protection Bureau on the working day immediately following receipt; the Environmental Protection Bureau issues a binding opinion within its remit within 30 working days, and the ISAF prepares a report and makes a decision within 30 working days from the date on which the information is complete and the opinion is received. These two segments alone account for approximately 60 working days (practical estimate, excluding corrections).
Insight two: an inspection stage sits between approval of the plans and issue of the licence. Once the plans are approved, the applicant must apply for inspection after the premises, facilities and equipment have been installed, within one year from receipt of the notification (one extension of the same period may be requested); the ISAF conducts the inspection jointly with the Environmental Protection Bureau within 15 working days from receipt of the application; the inspection record is drawn up within 20 working days from completion of the inspection. If the one-year time limit is not observed, the approval lapses.
Insight three: information on the technical director may be submitted later. The implementing rules provide that the information on the technical director to be engaged may be submitted after the premises pass the inspection. This is a pragmatic arrangement — companies do not have to lock in their choice of technical director at the early stage of the application.
Insight four: renewal of the manufacturing licence requires an on-site inspection of compliance with GMP. The renewal provisions expressly state that, for the purpose of renewing a manufacturing licence, the ISAF shall inspect the medical device manufacturing plant to verify whether it complies with the applicable good manufacturing practice requirements. Renewal is not a formality-only re-issuance.
4. Practical recommendations
- File the application already at the provisional industrial licence stage: this can materially shorten the overall timeline; do not wait until the definitive industrial licence has been obtained.
- Engage with the Environmental Protection Bureau in parallel: its opinion is a binding upstream step, so engineering plans should take environmental requirements into account from the outset.
- Prepare the quality management system documentation in accordance with Dispatch No. 22/ISAF/2026: this is the core technical document of the application.
- Build the one-year inspection application deadline into the project schedule: missing it causes the approval to lapse and the earlier investment to be wasted.
- Plan renewal in the 90 to 180 day window before expiry: this window is the same as the product registration renewal window, so both can be managed together.
5. Verification checklist
- □ Confirmed that a manufacturing licence is required (manufacturing medical devices in Macao, China)
- □ Application filed at the provisional industrial licence stage
- □ Dedicated form and 12 categories of attachments completed
- □ Quality management system documentation prepared in accordance with Dispatch No. 22/ISAF/2026
- □ Timeline planned for the Environmental Protection Bureau opinion (30 working days) and the ISAF decision (30 working days)
- □ Inspection application submitted within one year after approval of the plans
- □ Renewal scheduled 90 to 180 days before expiry
Regulatory information verified as of 29 October 2026. The laws, guidelines and effective dates described in this article are limited to the content published by the official sources listed under Legal basis as of that date; where official documents are updated, the most recently published version prevails.
How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support for Macao, China. Our team coordinates local licence holder arrangements, import and supply requirements, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com
Disclaimer
Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.
About GRZAN
GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.
GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.
Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.
What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.
Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.
Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.
Take your devices global with GRZAN
We work with manufacturers worldwide to open new markets with a clear regulatory pathway.
Contact us