1. Key takeaways
Sri Lanka’s device product registration dossier (the PRD, or Product Registration Dossier) can be filed through two submission routes. Route one is the full FMSA plus PRD route: the applicant first obtains the Foreign Manufacturing Site Approval (FMSA) for the overseas production site, and then proceeds with product registration. Route two is the PRD-only route, which does not require a separate site registration step and reviews the product documentation on its own. The core PRD documentation requirements are identical under both routes, so the real difference between them is whether the manufacturing site must pass through the approval stage before the product file can move forward.
- Route one (FMSA plus PRD) applies to general medical devices and IVDs under GL-034, which took effect on 23 July 2025.
- Route two (PRD without FMSA) applies to general medical devices, IVDs and Listed devices, and is open to both foreign and local manufacturers.
- Foreign manufacturers of Listed devices are exempt from manufacturing site registration under GL-034 and the NMRA medical device page.
- Both routes require submission of the same core PRD documentation set.
- Product-specific documentation is added according to product attributes, such as sterile, active, IVD or implantable status.
- The dossier structure combines general documents, the FMSA section where applicable, and the PRD section.
2. Legal basis
The two routes are grounded in guideline GL-034, which entered into force on 23 July 2025, and in the information published on the NMRA medical device page. The table below sets out how each route is defined, which products it covers, and how the dossier is assembled.
| Matter | Content | Source |
| Route one: FMSA plus PRD | Applies to general medical devices and IVDs | GL-034 (effective 23 July 2025) |
| Route two: PRD only, without FMSA | Applies to general medical devices, IVDs and Listed devices (both foreign and local manufacturers) | Same source |
| Site registration exemption for Listed devices | Listed devices of foreign manufacturers are exempt from manufacturing site registration | GL-034; NMRA medical device page |
| Commonality of PRD documentation | Both routes require submission of the core PRD documentation | GL-034 |
| Product-specific documentation | Supplemented according to product attributes (sterile, active, IVD, implantable, and so on) | Same source |
| Dossier structure | General documents plus the FMSA section (where applicable) plus the PRD section | GL-034 |
3. Expert insights
Insight one: choosing a route is essentially deciding whether the factory will be scrutinised. The FMSA plus PRD route means the foreign manufacturing site goes through document review and may face an on-site GMP inspection, while the PRD-only route skips that stage entirely. For a manufacturer entering Sri Lanka for the first time, the choice of route directly determines when the first order can land. The site stage adds lead time, coordination effort and inspection readiness work, so manufacturers should weigh it against their launch schedule from the very beginning rather than discovering the difference halfway through dossier preparation.
Insight two: Listed devices enjoy a structural exemption. The NMRA has stated explicitly that the Listed devices of foreign manufacturers are exempt from manufacturing site registration. This benefit is written into the rules themselves rather than being a discretionary concession left to the reviewer’s judgement. Because the exemption is structural, manufacturers of Listed devices can plan their projects on the assumption that no site application will be needed, and they do not have to argue for the exemption case by case. It also removes the risk of a site-level deficiency holding up the product file, since the site stage simply never opens for these products under route two.
Insight three: the core PRD checklist is shared by both routes. This means the documentation work does not differ in substance between the two routes. A manufacturer can complete the technical documentation according to the PRD checklist first and then decide which route to take. In practical terms, the PRD preparation effort is a sunk investment that remains valid whichever path is eventually chosen, which reduces the cost of keeping both options open during early planning.
A further consequence of the shared checklist is that switching routes late in a project does not discard the technical documentation already assembled. What changes with the route is only the site-side work: whether an FMSA application, a site review and a possible inspection must be slotted into the timeline. Manufacturers should therefore treat route selection and dossier preparation as two independent decisions that can be managed on separate tracks.
4. Practical recommendations
- Make the decision point early: first check whether the product falls within the low-risk list in Appendix 1 of GL-037, then check whether it holds approvals from recognised reference jurisdictions.
- If neither condition is met, schedule the project on the full FMSA plus PRD route and reserve time and budget for a GMP on-site inspection.
- Treat the two checks as a formal route decision node in the project plan, so the route is fixed before documentation work is completed rather than revisited afterwards.
- Prepare the core PRD documentation according to the shared checklist, since it stays the same under either route.
- Add the product-specific documentation only after the route decision, based on whether the product is sterile, active, an IVD or implantable.
- Document the rationale for the route choice in the project file, so that later deficiency responses and audits can show the decision was deliberate.
5. Verification checklist
- □ It has been decided whether the project follows the FMSA plus PRD route or the PRD-only route
- □ It has been checked whether the product is a Listed device (foreign manufacturers may be exempt from site registration)
- □ The core PRD documentation checklist has been prepared on the shared basis applicable to both routes
- □ Product-specific documentation has been added according to the product attributes (sterile, active, IVD, implantable)
- □ If the full route applies, time and cost for the GMP inspection have been reserved
- □ The route decision and its basis have been recorded in the project file
How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support across South Asia, including Sri Lanka. Our team prepares dossiers to NMRA expectations, manages submissions and deficiency responses, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com
Regulatory information verified as of 28 October 2026.
Disclaimer
Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.
About GRZAN
GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.
GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.
Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.
What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.
Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.
Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.
Take your devices global with GRZAN
We work with manufacturers worldwide to open new markets with a clear regulatory pathway.
Contact us