Pakistan Establishment Licence: DRAP Warehouse Inspection, Fees and Timeline
Updated: 2026-11-11 · GRZAN Regulatory Team · Verification date 2026-10-20
1. Key takeaways
A Pakistani Establishment Licence is subject to an on-site inspection by DRAP, and the inspection focuses on temperature control, hygiene conditions and storage capacity; the practical processing cycle for a new licence is a practical estimate of 2–4 months (another commonly cited estimate is 1–3 months). The application must be submitted online and must be accompanied by the site layout plan, the tax number (NTN), commercial registration, the device list, a stamp paper declaration and the payment voucher. None of these items is optional: a missing attachment is enough for the application to stall before the inspection stage is even reached.
- DRAP inspects the physical premises before granting the Establishment Licence, with temperature control, hygiene and storage capacity as the headline focus areas.
- The practical new-licence cycle is estimated at 2–4 months, with an alternative estimate of 1–3 months, so planning should assume the wider window and build contingency around it.
- The application is online only, and the attachment set — site plan, NTN, commercial registration, device list, stamp paper declaration and payment voucher — must be complete at filing.
- A failed or underprepared inspection stretches the new-licence timeline dramatically, which is why pre-inspection preparation matters more than filing speed.
2. Legal basis
The legal hooks for the premises inspection, the qualified-personnel requirements, the licence fees and the distribution standards all sit in the Medical Devices Rules, 2017 (notified on 16 January 2018). The inspection points and the processing cycle, by contrast, come from registration practice compilation and are therefore labelled as a practical estimate rather than a statutory figure.
| Item | Legal source | Provision |
| The MDB may inspect the premises and constitute an expert panel | Medical Devices Rules, 2017 (notified 2018-01-16) | Rule 15(1) |
| Manufacturing requires suitable premises and professional staff | Same instrument (manufacturing licence requirements) | Relevant provisions of MDR 2017 |
| Import, storage, distribution and sale must be conducted under the supervision of a qualified technical person | Same instrument | Relevant provisions of MDR 2017 |
| Establishment Licence fees (import) | Same instrument, Schedule C (rule 63): new licence PKR 20,000; renewal PKR 10,000 | — |
| Distribution standards (GDPMD) | Same instrument | Relevant provisions of MDR 2017 |
| Inspection focus points and processing cycle | Registration practice compilation (practical estimate) | — |
3. Expert insights
Insight one: the rules treat premises as a substantive condition, not a formality. The provisions expressly require applicants to hold suitable premises, require pharmaceutical and biomedical engineering professionals to be present and supervising in the manufacturing setting, and require protective facilities safeguarding worker health together with measures preventing industrial accidents. This is not a documentary review but a substantive condition tied directly to the licence itself. An inspector walking through the warehouse is checking whether the operation described in the file actually exists on the ground, and any gap between the paper and the premises is visible immediately during the walk-through.
Insight two: importers and local manufacturers face aligned premises requirements. The provisions state that an establishment applying to import and sell is subject to the same rules as a manufacturing establishment — it must have suitable buildings and arrangements, and the import, storage, distribution and sale must be conducted under the supervision of a qualified technical person. This means importers must also clear the premises hurdle. Foreign sponsors sometimes assume that because they do not manufacture in Pakistan, the physical site is a minor matter; the rulebook says otherwise, and DRAP’s inspection practice reflects the text. In practical terms, the importer’s warehouse is examined with the same seriousness as a factory floor, so importer projects need the same pre-inspection discipline as manufacturing projects.
Insight three: GDPMD is a continuing requirement across the whole licence period, not a one-off submission. Good Distribution Practice for Medical Devices — temperature and humidity control, FIFO stock rotation, traceability records — is examined both in the licence inspection and in routine inspections thereafter. GRZAN advises clients to build GDPMD into daily operating routines rather than arranging the warehouse for the inspection and letting the discipline slip afterwards. The records that satisfy an inspector on day one are the same records that must still be produced at the next visit, which is only achievable if the system runs every day, not just around inspection dates. A licence obtained on a staged warehouse is a liability, not an asset, because the next inspection will find the gap.
4. Practical recommendations
When GRZAN helps a client prepare Establishment Licence materials, the first step is always a premises pre-inspection conducted against DRAP’s inspection focus points, scored item by item.
- Score the site in advance against the inspection focus points: temperature and humidity monitoring equipment and its records, zoning and segregation, hygiene and pest control, storage capacity and product flow, and the qualifications and presence of the technical staff.
- Where the pre-inspection does not pass, require corrective work to be completed before the inspection is booked — because a failed inspection stretches the new-licence cycle from 2–4 months to well over half a year.
- Assemble the complete online attachment set before filing: site layout plan, NTN, commercial registration, device list, stamp paper declaration and payment voucher.
- Keep GDPMD as a standing operating system — temperature and humidity control, FIFO rotation and traceability records — rather than a display arranged for the inspection day.
- Confirm the qualified technical person is genuinely on site, with qualification evidence retained and available to the inspector.
- Plan the licence calendar around the wider of the two practical estimate ranges (2–4 months) so downstream product submissions are not built on optimistic assumptions.
5. Verification checklist
- □ The site layout plan has been prepared and matches the actual premises
- □ Temperature and humidity monitoring equipment is installed with continuous records
- □ Hygiene conditions and pest control measures are in place
- □ Storage capacity matches the product list
- □ The qualified technical person is on site with qualification evidence retained
- □ GDPMD system documentation is written down and can be shown on site
Regulatory information verified as of 28 October 2026.
How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support across South Asia, including Pakistan. Our team prepares dossiers to DRAP expectations, manages eCTD-format submissions and deficiency responses, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com
Disclaimer
Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.
About GRZAN
GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.
GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.
Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.
What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.
Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.
Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.
Take your devices global with GRZAN
We work with manufacturers worldwide to open new markets with a clear regulatory pathway.
Contact us