Fee Breakdown: Recipe Approval Stage vs Final Registration Stage

Updated: 2026-11-11 · GRZAN Regulatory Team · Verification date 2026-10-20

1. Key takeaways

Government fees in Bangladesh are paid at two separate points in the process. The first payment, BDT 5,000 plus 15% VAT, a total of 5,750, is made when the recipe approval application is filed. The second, BDT 50,000 plus 15% VAT, a total of 57,500, is made when the registration application is filed after the recipe approval letter has been issued. The two together come to BDT 63,250, and the final stage is ten times the recipe stage. The official schedule contains only these two items, and there is no line for a BDT 500 pay order.

  • Payment one is 5,750 and payment two is 57,500; neither can be deferred to the other stage.
  • The split is approximately 9% at the recipe stage and 91% at the registration and inspection stage.
  • The interval between the two filings is 3 to 4 months, which is a practical estimate rather than a published period.
  • If an application is returned, the government fee is normally not refunded, and a resubmission requires a second payment.
  • VAT is calculated on each base fee separately, so the two payments never share one tax base.
  • The second payment is triggered by the recipe approval letter, which makes that letter a financial milestone as well as a regulatory one.

2. Legal basis

The schedule is structured by stage rather than by total, which is why the fee has to be read as two entries instead of one. Each stage has its own base amount, its own VAT line and its own payment point. The table below sets out the sequence and the amount payable at each step.

Step one: recipe approval5,000 plus VAT = BDT 5,750When the recipe approval application is filedDGDA fee schedule, page 1, item ৫
Step two: registration and inspection50,000 plus VAT = BDT 57,500When the registration is filed after recipe approvalDGDA fee schedule, page 2, item ৫
TotalBDT 63,250Not applicableSum of the two payments
Interval between the steps3 to 4 monthsNot applicablePractical estimate
Refund on return of a fileNormally not refunded; resubmission requires a further paymentNot applicablePractical estimate

The sequencing has a documentary consequence that is easy to miss. The first payment buys an assessment of the recipe, not an assessment of the product as a whole, and the second payment buys the registration and inspection work. A manufacturer that treats the first payment as a deposit against the second will misread both the cash flow and the review depth. The schedule treats them as two transactions because they are two decisions, taken at two different moments, on two different questions.

3. Expert insights

Insight one: the two steps are in a ratio of one to ten, not an even split. The recipe stage accounts for 9% of the total at 5,750, and the registration and inspection stage accounts for 91% at 57,500. That ratio runs in the opposite direction to the depth of review, because the first step examines the requirements and the second examines the substance. For financial planning the implication is that the main funding pressure arrives late in the project, and early-stage cash flow pressure is systematically underestimated. A budget approved on the assumption of an even split will be short at exactly the point where the file cannot proceed without payment.

Insight two: each payment carries its own VAT, and the tax base cannot be merged. The schedule reads as BDT 5,000 per product plus 15% VAT on that fee, and BDT 50,000 per product plus 15% VAT on that fee, with each payment made on its own TR Challan; the registration and inspection payment uses code ১-২৭১৫-০০০০-১৮৬৩. Two errors recur in Chinese-language quotations. The first is to omit VAT altogether. The second is to add the two base fees together and apply 15% once, which produces the same percentage but the wrong instrument, since the two payments are separate transactions with separate challans. Either error surfaces as a top-up demand at the counter.

Insight three: the 3 to 4 months between the steps is both a funding opportunity and a funding risk. The opportunity is that the full amount does not have to be committed at once, so a manufacturer can stage its outlay across a quarter. The risk is that if the first filing is returned, the government fee is normally not refunded, and the second submission requires a fresh payment. That combination is the financial reason for a rigorous completeness check before the first filing: one return costs double the fee plus a quarter. The fee is not the largest cost in that scenario; the lost quarter usually is.

Insight four: the recipe approval letter is a payment trigger, so its date belongs in the project plan. Because the second payment falls due when the registration is filed after the recipe approval letter, the date of that letter sets the date of the largest cash outflow in the project. A plan that tracks the letter only as a regulatory milestone will be surprised by the invoice that follows it. Treating the letter as a joint regulatory and financial event allows the treasury calendar and the submission calendar to be built from the same date.

4. Practical recommendations

GRZAN ties fee payment to process milestones in a single schedule: the first payment date is the filing date, and the final payment date is within five working days of the recipe approval letter being issued. We also ask clients to hold a budget for a second payment in the event of a return. The reason is not that returns are likely; it is that when one happens, a client without a reserve tends to lose another quarter before resubmitting, which turns three months into six.

  • Provision the first payment at BDT 5,000 plus 15% VAT, and record the 5,750 total rather than the base fee.
  • Provision the final payment at BDT 50,000 plus 15% VAT, and place it in the quarter in which the recipe approval letter is expected.
  • Compute VAT twice, once for each payment, and keep the two challans as separate documents in the finance file.
  • Bind each payment date to a filing or approval milestone rather than to a calendar month.
  • Hold a reserve equal to the final payment, so that a return does not force a delay while funds are approved.
  • Plan the cash flow around a 3 to 4 month interval between the two filings, and treat any shorter interval as an upside rather than as the base case.

5. Verification checklist

  • □ The first payment is provisioned at BDT 5,000 plus 15% VAT (5,750)
  • □ The final payment is provisioned at BDT 50,000 plus 15% VAT (57,500)
  • □ The two VAT amounts are calculated separately, with no consolidated tax base
  • □ Each payment date is bound to a filing or approval milestone
  • □ A reserve for a second payment on return has been provided
  • □ The cash flow plan reflects the 3 to 4 month interval between the two steps

Regulatory information verified as of 6 November 2026, against the original DGDA fee schedule.

How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support across South Asia, including Bangladesh. Our team prepares dossiers to DGDA expectations, manages submissions and deficiency responses, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com

Disclaimer

Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.

About GRZAN

GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.

GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.

Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.

What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.

Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.

Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.

Take your devices global with GRZAN

We work with manufacturers worldwide to open new markets with a clear regulatory pathway.

Contact us
WhatsApp
QR Code
WhatsApp QR Code
Scan to chat on WhatsApp
Phone
Call
Office Mon-Fri 9:00-18:00
0755-88659477
Mobile 24/7 Service
+86 15816864648
Email
Mail