India’s US$6,000 Overseas Manufacturing Site Inspection Fee
Updated: 2026-11-11 · GRZAN Regulatory Team · Verification date 2026-10-20
1. Key takeaways
India’s Central Licensing Authority may, under Rule 34(1) of the Medical Devices Rules, 2017, inspect an overseas manufacturing site itself or through a person it authorises. The resulting fee is US$6,000 under the Second Schedule, borne by the applicant. CDSCO states explicitly that an overseas manufacturing site inspection may take place before or after the grant of the licence, as the case requires — so holding an MD-15 does not remove the inspection risk.
- Statutory power: Rule 34(1) allows the CLA to inspect an overseas site directly or through an authorised person or body.
- Cost to the applicant: the US$6,000 inspection fee under the Second Schedule is payable by the applicant, not by the authority.
- Timing is open-ended: inspection may occur before or after the licence is issued.
- The 9-month clock is unaffected: Rule 36(1) requires a decision within 9 months of application whether or not an inspection takes place.
2. Legal basis
The inspection power, its cost and its timing are set out across Rule 34(1), the Second Schedule and Rule 36(1). The table consolidates the operative text points.
| Item | Source | Content |
|---|---|---|
| Inspection power | MDR 2017 Rule 34(1) | On receipt of an application under Rule 34(1), the CLA may inspect the overseas manufacturing site itself or through an authorised person or body |
| Cost bearing | MDR 2017 Rule 34(1)(ii); Second Schedule | The applicant must pay the prescribed fee towards the expenditure required for inspection of the overseas manufacturing site |
| Amount | MDR 2017 Second Schedule | Overseas manufacturing site inspection US$6,000 |
| Timing of inspection | CDSCO official FAQ (practical estimate) | Inspection of an overseas manufacturing site may take place before or after grant of the licence, as required |
| Relationship to the review period | MDR 2017 Rule 36(1) | Whether or not an inspection is carried out, the decision must be made within 9 months from the date of application |
3. Expert insights
Insight 1: the US$6,000 is a contingent cost, not an application fee. It is not payable at submission; it arises when CDSCO decides to inspect. In a budget it therefore belongs on a separate line and must not be merged into fixed costs. Treating it as fixed either overstates the minimum cost of entry or, worse, leads a company to assume the money has bought an inspection that will never be scheduled. The cleanest convention is a two-column budget: committed fees on one side, triggered fees on the other, with the inspection row explicitly marked as pending verification of whether CDSCO will call for a visit.
Insight 2: the 9-month review period is unaffected by inspection. Rule 36(1) is worded so that the 9-month clock runs whether or not a site inspection is conducted. This means an inspection does not buy the company extra preparation time: the decision deadline stays where it was, and a site that is not inspection-ready at short notice is exposed rather than protected. Planning therefore has to assume that the visit may arrive at any point in the review window, with limited notice and no extension of the overall timeline.
Insight 3: inspection can follow the grant of the licence. This is the point most often overlooked. A company that relaxes site management once the MD-15 is in hand, and is inspected in month 13, faces the same problems as one inspected before approval — except that the licence is now in force and the consequences land on a live product. Post-market standing depends on the site remaining in the condition described in the file. In practice the most common gap is not a dramatic change but a gradual one: a line relocated within the building, a warehouse extended, a contract manufacturer added, none of which was reflected in the plant master file.
Insight 4: the PMF is the first document the inspection team reads. The plant master file prepared under Appendix I of the Fourth Schedule sets the expectations that the inspection team carries into the visit. A mismatch between the PMF and the actual site is a direct source of non-conformities, and it is the kind of mismatch that arises from routine changes — a new line, a moved warehouse, a changed supplier — that nobody thought to reflect in the file. Because the file is written once and the site changes continuously, the PMF drifts unless someone owns it.
4. Practical recommendations
- Treat overseas inspection as a whole-lifecycle matter, not an application-stage task. GRZAN treats the overseas site inspection as a full-cycle issue rather than a filing step, and requires clients to maintain site conditions after the MD-15 is granted and to keep operating in line with the PMF description.
- Prepare an inspection-response plan as a standing document. We recommend that clients keep a standing inspection-response file: a named contact person, a bilingual index of system documents, and accompanying staff who understand both the technology and English.
- Keep the PMF synchronised with the actual site. Any change to buildings, lines, utilities or key suppliers should trigger a PMF review rather than being recorded only in internal quality documents.
- Budget the US$6,000 as a separate contingent line. Do not fold it into the fixed registration fee, because it is triggered by a decision rather than by filing.
- Rehearse the walk-through before any inspection is announced. The value of a prepared plan when an inspection actually arrives is far higher than that of an ad hoc organisation assembled at short notice.
5. Verification checklist
- □ The US$6,000 is listed separately as a contingent cost
- □ The PMF is consistent with the actual site conditions
- □ An inspection contact person and accompanying staff have been designated
- □ An English index of system documents is available
- □ Site conditions are maintained after the licence is granted (inspection may follow issuance)
Regulatory information verified as of 27 October 2026.
How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support across South Asia, including India. Our team prepares dossiers to CDSCO expectations, manages SUGAM submissions and deficiency responses, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com
Disclaimer
Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.
About GRZAN
GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.
GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.
Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.
What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.
Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.
Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.
Take your devices global with GRZAN
We work with manufacturers worldwide to open new markets with a clear regulatory pathway.
Contact us