IVD Medical Devices in India: The Regulatory Divide

Updated: 2026-11-11 · GRZAN Regulatory Team · Verification date 2026-10-20

1. Key takeaways

In vitro diagnostic devices (IVDs) in India are likewise governed by the Medical Devices Rules, 2017, and the import route is the same as for ordinary devices (Form MD-14 → MD-15). The differences lie in four places: the fee schedule is different, a performance evaluation report (PER) must be submitted, clinical performance evaluation (CPE) of a new IVD must in principle be conducted in India, and a new IVD must first obtain a Form MD-29 permission. None of these four differences is visible from the application forms themselves, which is why IVD projects planned by analogy with ordinary devices discover the divergences late, when they are expensive to accommodate.

  • IVDs follow MDR 2017 and the same MD-14 → MD-15 import route.
  • IVD fees follow their own lines in the Second Schedule.
  • A performance evaluation report covering three independent batches is required.
  • Clinical performance evaluation for new Class B/C/D IVDs is done in India.
  • New IVDs need prior permission under Rule 36(6) before any import licence.

2. Legal basis

The IVD-specific regime is assembled from the Rules, the fee schedule, the CDSCO IVD guidance and the CDSCO IVD FAQ. The table below collects the governing entries. Because the sources are spread across several documents, the most reliable way to plan an IVD project is to fix each of the four divergences to its source entry at the outset, rather than discovering them one deficiency letter at a time.

SubjectLegal sourceContent
New IVDs require prior permissionMDR 2017 Rule 36(6)For investigational devices or new IVDs, the applicant must first obtain an MD-27 or MD-29 permission; otherwise no import licence of any class may be granted
IVD import feesMDR 2017 Second Schedule (reproduced entry by entry in the CDSCO Guidance for Import of IVDs)Class A/B IVDs: USD 1,000 site fee + USD 10 per device; Class C/D IVDs: USD 3,000 site fee + USD 500 per device
Performance evaluation reportCDSCO IVD FAQ question 66A performance evaluation report for three independent batches must be submitted, the three batches being produced from three different lots of key raw materials (such as antigens and antibodies)
Six-jurisdiction approvals do not waive CPEsame FAQ, question 68Approval of a new IVD (Class B/C/D) in the European Union, the United Kingdom, Australia, Canada, Japan or the United States does not constitute an exemption from clinical performance evaluation in India; the CPE must be conducted in India
New Class A IVDssame FAQ, question 69In principle no CPE is required, but the CLA may require it where it considers necessary
Test licence feessame FAQ, question 76IVD test licence: USD 100 (the same standard for Classes A/B/C/D)
Classification documentIVD/Misc/196/2020 (2023-10-25)IVD risk classification guidance

3. Expert insights

Insight one: IVDs are the same road under different rules. The forms and the process look identical to ordinary devices, but the pricing lines of the Second Schedule, the batch requirements of the PER and the localisation requirement of the CPE are all independent rules. Planning an IVD project with ordinary-device common sense produces failures at three separate points in sequence: first in the fee budget, then in the dossier structure, and finally in the timeline when the local evaluation requirement surfaces.

Insight two: question 68 is one of the most consequential findings in this series. For ordinary devices, a free sale certificate from the recognised jurisdictions can avoid an Indian clinical investigation (Rule 36(3)). For new IVDs this does not work — CDSCO has answered expressly that, whatever the regulatory status in those countries, the CPE of a new IVD must be done in India. This single answer raises the timeline and the cost of an IVD project by an order of magnitude, and it must be built into the business case before the project is committed, not after.

Insight three: the three-batch by three-raw-material-lot requirement looks simple and is the hardest to execute. It requires the manufacturer to have products made from three different lots of key raw materials produced and submitted for evaluation before the application — a front-loaded action at the production planning level, not a document assembly action. Manufacturing slots, raw material lots and stability considerations must be scheduled months ahead, and a delay in any one lot delays the entire application.

Insight four: the fee structure is remarkably favourable to multi-product IVD portfolios. A Class A/B IVD costs only USD 10 per device, against USD 1,000 per device for an ordinary Class B device — a hundred-fold difference. This means the expansion cost of an IVD product line sits mainly in the PER and the CPE, not in official fees, so portfolio strategy should be optimised around evaluation capacity rather than around fee arithmetic.

4. Practical recommendations

  • GRZAN manages IVD projects separately from ordinary device projects, as a distinct workflow with its own gates.
  • At initiation, the client must first answer three questions: is the product a new IVD (deciding whether MD-29 and CPE apply)?
  • Is the target class C/D or A/B (deciding the depth of the PER and the fee lines)?
  • Are products from three different lots of key raw materials already in production (deciding whether the project can start immediately)?
  • Until these three questions have answers, GRZAN does not quote and does not schedule — because each unanswered question hides a timeline risk that no submission plan can absorb.

5. Verification checklist

  • □ It has been determined whether the product is a new IVD (deciding whether MD-29 prior permission is needed).
  • □ The class has been determined under the IVD classification guidance as Class A/B/C/D.
  • □ Three independent batches, from three different lots of key raw materials, have been scheduled for production.
  • □ It has been confirmed that CPE must be conducted in India (new Class B/C/D IVDs).
  • □ Fees have been estimated against the IVD lines of the Second Schedule, not the ordinary device lines.

How GRZAN can help. GRZAN provides medical device and IVD registration, quality system, authorised representative and local testing support across South Asia, including India. Our team prepares dossiers to CDSCO expectations, manages SUGAM submissions and deficiency responses, and supports post-market vigilance obligations. Business enquiries: info@grzanglobal.com

Regulatory information verified as of 27 October 2026.

Disclaimer

Prepared by GRZAN from publicly available regulation. It is provided for general information only and does not constitute legal advice. Legislation and official fees are subject to change by the competent authority.

About GRZAN

GRZAN (Global Regulatory Zone Access Navigator) — the global market-access navigator for medical devices and IVDs.

GRZAN is a specialist consultancy for medical device and IVD market access, providing end-to-end regulatory solutions across the product lifecycle and making international market entry simpler and faster.

Key figures. More than 25 wholly owned subsidiaries worldwide covering 50+ countries and regions; chosen by 100+ listed and leading Chinese device manufacturers, with 4,000+ successful cases; 12+ years in the sector and 200+ regulatory training sessions and seminars delivered.

What we do. Global market access: multi-country registration programmes, technical documentation, regulatory advice. Clinical evidence: clinical evaluation reports (CER), usability studies, overseas clinical investigations. Quality systems: ISO 13485, MDSAP, FDA QMSR and BGMP implementation and audit readiness. Authorised representative and licence-holder services across Southeast Asia, Latin America, the Middle East, Africa, Europe and North America.

Why GRZAN. A real operating entity, with the certificate held by the manufacturer: our direct overseas subsidiaries act as the compliant local holder, so the regulatory relationship stays clear and you keep control rather than being tied to a distributor. Direct access to the team: no time-zone gap, no language barrier, no cultural gap. Review points anticipated: we know what FDA 510(k), EU MDR, Southeast Asian, Latin American and Middle Eastern reviewers look for, which shortens timelines and reduces deficiency letters. Pathway planning: pre-decision analysis and risk assessment before you commit.

Every engagement rests on three commitments: efficiency through pre-submission review, certainty through a clear pathway, and stability through a licence-holder that stays in place.

Take your devices global with GRZAN

We work with manufacturers worldwide to open new markets with a clear regulatory pathway.

Contact us
WhatsApp
QR Code
WhatsApp QR Code
Scan to chat on WhatsApp
Phone
Call
Office Mon-Fri 9:00-18:00
0755-88659477
Mobile 24/7 Service
+86 15816864648
Email
Mail